Machinga HREE Project, Malawi

Granted EL0529, Area: 42.9km2, EL0705 157.5km2

Southern Malawi is clearly prospective for REEs.

Machinga is contained within a large alkaline complex of the Chilwa Alkaline Province that intrudes Proterozoic basement gneisses, granulites and amphibolites. This complex comprises nepheline-syenites of the Mongolwe, Chaone and Chinduzi Ring complexes, the Malosa syenite pluton and minor alkaline granites

Commodity:
Heavy REEs and niobium
Tenements:
EL0529, EL0705
Project Size:
200.4km²
Ownership:
Granted and Under Valid Application.

Geology

The project area is dominated by the Malosa syenite pluton, but also contains discrete and smaller-scale intrusions and pegmatites.The Machinga radiometric anomaly is continuous along a strike of approximately 7 km, indicating that potential to discover further eudialyte-hosted REE mineralisation may be significant. The eudialyte is associated with the granitic-syenitic pegmatites, which are the target along the margins of the plutons, as well as in the central zone of Machinga.

Results:

Successful completion of maiden 35-hole RC and 8 DDH drilling program for 4,543m at Machinga HREE and Nb project. Initial exploration focused on historical 2010 drill program for 4000m (Machinga North). Future exploration include extending NE into new licence EL0705 and South along the anomalous zone

2023 Maiden Reverse Circulation and Diamond Core drill Assay significant results:

Significant assay results include:

  • 15.1m @ 1.01% TREO, 0.36% Nb2 O5 from 23.9m (3.71% Dy/ Tb/TREO) incl. 4m @ 1.75% TREO0.63% Nb2 O5 from 33m (3.8% Dy/Tb/TREO) drilled downdip (MDD007)
  • 13m @ 0.65% TREO, 0.25% Nb2 O5 from surface; incl. 1m @ 1.06% TREO, 0.37% Nb2 O5 from 7m, and 1m @ 1.28% TREO, 0.42% Nb2 O5 from 9m (MR019)
  • 7m @ 1.42% TREO with 0.49% Nb2 O5 from 65m (MR011)
  • 16m @ 0.54% TREO with 0.21% Nb2 O5 from 78m, incl. 3m @ 1.63% TREO, 0.7% Nb2 O5 from 87m (MR005)
  • 11m @ 0.74% TREO, 0.29% Nb2O5 from surface (3.8% DyTb/TREO) incl. 2m @ 1.36% TREO, 0.49% Nb2O5 from 6m (4% Dy/Tb/TREO) (MR024)

Significant assay results include:

  • 13m @ 0.65% TREO, 0.25% Nb from surface; incl. 1m @ 1.06% TREO, 0.37% Nb from 7m, and 1m @ 1.28% TREO, 0.42% Nb from 9m (MR019)
  • 7m @ 1.42% TREO with 0.49% Nb from 65m (MR011)
  • 15.1m @ 1.01% TREO, 0.36% Nb from 23.9m incl. 4m @ 1.75% TREO, 0.63% Nb from 33m drilled downdip (MDD007)
  • Rock Chips confirm significant mineralised footprint along strike.

Mineralisation:

  • Strongly mineralised hydrothermal breccia system striking NW-SE and dipping shallowly ~35° to the NE has been confirmed by the recent drilling.
  • Drill cross sections demonstrate excellent continuity with radiometric contour predicting the mineralised higher-grade zone.
  • High grade HREE-Nb confirmed from RC and DD drill results at Machinga Central Zone.
  • The mineralisation at the Machinga alkaline complex contains a higher proportion of valuable dysprosium-terbium (DyTb) with results indicating an average 3.6% DyTb:TREO in samples greater than 0.25% TREO

MDD007 26.74 – 30.81m

MDD007 30.81 -35.22m

MDD007 30.81 -35.22m

Get the latest Tusker updates by subscribing to our Announcements!

Tusker Minerals is an African-focused explorer advancing a world-class portfolio of critical mineral assets across Cameroon and Malawi.

© 2026 Tusker Minerals LTD.